4 Earthing System

4.1 Earth Systems in an Installation

Earthing systems in an electrical installation can be identified as follows:


a.

Electrical system earth; defined in Part 1; Section 312 and Part 5-54 (which will be covered in this handbook).

b.

Equipotential earth (for protection) covered in Part 4-41, Part 4-44 and 5-54 (which will not dealt with in this handbook).

c.

Equipotential earth (for EMC) covered in IEC61000-5-2 “Electromagnetic compatibility (EMC)”; Part 5: Installation and mitigation guidelines – Section 2: Earthing and cabling” (which will not dealt with in this handbook).


4.2 Earthing System Defined in IEC 60364; Part 1, 312

System earth in an installation is defined in Part 1; 312 1st

From the above, three main earthing system types can be identified.

Note: If isolating transformer (iTx) has primary of Δ then TN-C system is used. If iTx has primary of Y, then TN-S system is used.

a.

TT System – where the source neutral is earthed and the frame of the load is independently earthed. TT system has 4 cables comprising 3P + N. TT system requires independent earth at both ends of the connections.

b.

TN System – where the source neutral is earthed and the frame of the final load is earthed through a protective conductor (PE) which connects back to “source” earth. TN has two sub systems:

(i) TN-C System – where the frame earth is linked via the neutral to the source earth,creating a combined PE and Neutral (PEN) conductor. TN-C system has 4 cables comprising 3P + PEN.

(ii) TN-S System – where the frame earth is connected through a separate ‘earth continuity conductor’ called the ‘Protective Earth’ or PE. TN-S system has 5 cables comprising 3P + N + PE.

TN system requires only one earth point at source.

c.

IT System – where the source neutral is unearthed and the frame of the final load is independently earthed. IT system has 3 cables comprising 3P. An earth point would be required at termination end.


Note: “IN” system is topographically not possible (frame earthing linked back to source neutral earth is not possible when source neutral is unearthed). An “IN” system would in effect be a completely unearthed installation and IS NOT ALLOWED for safety reasons.